Bridging the Blue Nile

Feasibility study, detailed design and construction supervision for the construction of a 3-span 525 m long cable stayed bridge crossing the River Nile at Jinja.

Location
Uganda
Official Title
The Feasibility Study, Detailed Design, and Construction Supervision of the 2nd Bridge Across the Nile at Jinja
Project Type
Client
Services Provided
Construction Supervision
Project Period

2013 – 2019

Sustainable Development Goals (SDGs)