Hanoi Metro Line 2

General Consulting Services for Hanoi's Urban Railway Line 2 Project. The major works of the project are 8.5 km length underground construction, including 7 underground stations, 3 km length elevated track, including 3 stations, depot, operation control system and rolling stocks supply.

ロケーション
ベトナム
正式名称
Hanoi City Urban Railway Construction Project (Nam Thang Long - Tran Hung Dao Section (Line 2)) (I)
プロジェクトタイプ
クライアント様
プロジェクト期間

2011 – 2023

持続可能な開発目標(SDGs)