Feasibility study (alignment study) including photogrammetry, detailed design, tender assistance, and construction supervision of 95 km of 4-lane expressway.
OC Global has designed and is now managing the construction of new bridges parallel to the existing Kanchpur, Meghna and Gumti bridges and the rehabilitation of the existing bridges.