Feasibility study, detailed design and construction supervision for the construction of a 3-span 525 m long cable stayed bridge crossing the River Nile at Jinja.
ロケーション
ウガンダ
正式名称
The Feasibility Study, Detailed Design, and Construction Supervision of the 2nd Bridge Across the Nile at Jinja