Hanoi Metro Line 2
General Consulting Services for Hanoi's Urban Railway Line 2 Project. The major works of the project are 8.5 km length underground construction, including 7 underground stations, 3 km length elevated track, including 3 stations, depot, operation control system and rolling stocks supply.