Feasibility study, detailed design and construction supervision for the construction of a 3-span 525 m long cable stayed bridge crossing the River Nile at Jinja.
ロケーション
ウガンダ
正式名称
The Feasibility Study, Detailed Design, and Construction Supervision of the 2nd Bridge Across the Nile at Jinja
OC Global has designed and is now managing the construction of new bridges parallel to the existing Kanchpur, Meghna and Gumti bridges and the rehabilitation of the existing bridges.